Office: 1700 Scherer Pkwy, St Charles, MO Mon–Fri 8–6 · Sat 9–2 · Sun closed (314) 730-4080

Insurance, Permits & Documents

Does a Metal Roof Need an ICC-ES Report?

An ICC-ES report is not automatically required for every metal roof. It is product-specific evidence that can help a code official approve a system when ordinary code paths or listed standards do not fully answer the question.

Quick answer

No. A residential metal roof does not automatically need an ICC-ES Evaluation Report (ESR); the IRC contains prescriptive provisions for metal roof panels and shingles, and an ESR is typically useful only for products or uses outside those prescriptive paths or when the AHJ or project spec requests it.

Key takeaways

  • An ICC-ES report evaluates a specific product or system; it is not a blanket approval for every metal roof[1][2].
  • Many metal roofs can follow the adopted residential code and the manufacturer’s approved installation instructions without an ESR[3].
  • A code official may ask for an ESR or comparable evidence when the product, assembly, site, or code path is not straightforward[1][2].
  • For every project, the product manufacturer’s documents and the local AHJ control compliance; Bishop's Metal Roofing is a residential metal-only specialist serving incorporated communities in Missouri and Illinois[1][2][4].

What is an ICC-ES Evaluation Report?

ICC-ES is a technical evaluation service associated with the International Code Council. An Evaluation Report (ESR) states findings, conclusions, and recommendations for a defined building product or system. It identifies the code provisions or acceptance criteria evaluated rather than simply saying that every use of a material is approved[1].

An ESR normally names the report holder and product, describes the evaluated scope, lists properties such as fire or wind performance when evaluated, and gives installation requirements and conditions of use[2]. It is evidence tied to an identified assembly, not a quality badge that transfers to unrelated panels, fasteners, slopes, or installation methods.

Common compliance documents for a metal roof
DocumentWhat it can showWhat it does not establish
ICC-ES Evaluation Report[1][2]Evaluated code scope, properties, installation requirements, and conditions of use for a named product or system.Automatic approval for a different product, detail, code edition, or installation.
Manufacturer installation instructions[3]Required application details, slope limits, fastening, flashing, and approved methods.That the local AHJ will accept every method or that the installer followed it.
Test or listing report[4]Results or classification under a named test or rating standard.A complete permit approval or suitability outside the tested scope.
WarrantyContract terms, exclusions, and claim procedures from its issuer.Code compliance, design correctness, or guaranteed storm performance.

When does a residential metal roof need an ESR?

The residential code already contains prescriptive rules for common metal roof types. For example, its metal-roof-panel provisions address deck or support conditions, minimum slope by seam type, corrosion-resistant materials, and attachment in accordance with the chapter and approved manufacturer instructions[3]. Metal roof shingles likewise have rules for deck, slope, materials, application, and flashing[3].

When the selected product and proposed installation fit the jurisdiction’s adopted code and the manufacturer’s approved instructions, the permit package may be supported by those ordinary documents. The local AHJ decides whether the submitted evidence is sufficient, and code editions and amendments vary by location[4].

When will my building department request evaluation evidence?

An ESR can be valuable when a product is new, proprietary, unusually configured, or not clearly covered by a prescriptive section. It may also help when a project specification, plan reviewer, insurer, or public owner asks for third-party documentation. ICC-ES explains that reports can address products that need an alternative method of showing compliance with the IBC or IRC[1].

It usually means the reviewer needs a traceable connection between the proposed product and the code. Ask the building department what it wants: a particular ESR, a manufacturer’s engineering report, fire or wind test evidence, a listing, a stamped calculation, or installation instructions. Do not substitute one document for another without the AHJ’s agreement.

What should I check in a roofing evaluation report?

Start with identity. Match the ESR’s report holder, product name, profile, thickness or configuration, accessories, and identification marks to the material in the proposal. Then review the evaluation scope and properties evaluated. An ESR may cover only certain roof slopes, substrates, attachment patterns, wind pressures, fire classifications, or climate-related conditions[2].

Next, read installation and conditions of use rather than stopping at the report number. Confirm that the proposed underlayment, flashings, clips or screws, seams, penetrations, and edge details follow the report and the manufacturer’s current instructions. ICC-ES lists evidence submitted—such as test reports, calculations, and installation instructions—as part of the report’s technical basis[2].

How is an ESR different from a warranty?

An evaluation report addresses code compliance for the evaluated scope. It does not promise that a roof will never leak, remain undamaged after a storm, or last for a particular number of years. It also does not replace proper design, compatible materials, correct detailing, or inspection. Performance language in an ESR is limited by its stated conditions of use[1][2].

A warranty is a separate contract with its own issuer, exclusions, maintenance duties, and claim process. For Bishop's Metal Roofing, the business facts state that Bishop's states a 50-year warranty, while the current written warranty controls all terms. Homeowners should request the actual warranty and the product documents together, then compare their scopes instead of treating either document as a guarantee of an outcome.

How can Missouri and Illinois homeowners verify the compliance path?

Begin with the permit office for the property. Ask which residential or building code edition and local amendments apply, whether the project is being reviewed under a prescriptive metal-roof provision, and what documents must accompany the permit. The NRCA notes that states and local governments develop and adopt building codes, while model codes reference industry standards such as ASTM standards[4].

Then ask the roofing contractor or manufacturer for the exact submittal package: product data, installation instructions, test or listing information, and an ESR if one applies. Bishop's serves incorporated communities in Missouri and Illinois and installs stone-coated steel shingles and standing seam metal roofing; it does not install asphalt shingles, tile, slate, cedar, membrane roofing, or exposed-fastener panels on homes. Those business facts describe scope, not an automatic code approval.

What documents should I get before signing?

A clear proposal should identify the metal roof profile and manufacturer, substrate assumptions, slope limitations, underlayment, flashings, penetrations, fasteners or clips, ventilation interfaces, and who handles permit submittal. If an ESR is cited, record its number and verify that the listed product and installation match the proposed system. ICC-ES maintains a reports directory organized by construction categories, including roof materials and metal roof panels[5].

Finally, keep the approved documents with the permit and closeout records. If the AHJ requests a change, obtain written clarification before material is ordered or installation begins. The most reliable approach is not to hunt for an ESR number in isolation; it is to demonstrate that the complete roof assembly, as proposed and installed, follows an accepted code path with product-specific evidence where needed.

This article provides general educational information, not legal, engineering, permit, insurance, or financial advice. Code editions, amendments, product documents, and AHJ requirements can change. Do not access a roof or perform hazardous work based on this article. Confirm the applicable requirements with the local building department and qualified roofing professionals; the current product documents, permit conditions, and written warranty control.

FAQ

Does a Metal Roof Need an ICC-ES Report: common questions

Can a metal roof pass inspection without an ICC-ES report?

Often, yes, when the selected roof is covered by the jurisdiction’s adopted code and the manufacturer’s approved installation instructions. The IRC contains prescriptive provisions for metal roof shingles and panels, including slope, materials, deck, flashing, and attachment[3]. Ask the permit office before ordering materials, and submit documents that identify the exact roof system.

Does an ICC-ES report approve the entire roof installation?

No. An ESR is limited to the product or system, evaluated scope, and conditions stated in that report[1][2]. It does not approve an unrelated profile, substitute fastener, different substrate, changed slope, or workmanship that departs from the listed method. The roof still must be designed and installed for the project, follow the adopted code, and satisfy inspections. Treat the ESR as one piece of traceable evidence, not as a blanket approval for every roof carrying a similar material description.

Where can I verify whether a metal roofing ESR is current?

Use the ICC-ES reports directory and the report PDF, then compare the report holder, product identification, scope, and conditions of use with the proposal[5]. Ask the manufacturer or contractor for the current document rather than relying on an old screenshot or a report number copied into an estimate. The permit office can also tell you whether it accepts that report for the adopted code edition. If the report has supplements or revisions, ask which version applies to your project and jurisdiction.

Is an ICC-ES report the same as UL, FM, ASTM, or a manufacturer test?

No. These documents serve different purposes. ASTM standards can define test methods or material requirements; UL or FM documents may address a listed assembly or rating; a manufacturer report may provide engineering or installation data; and an ICC-ES ESR evaluates a defined product against stated code provisions or acceptance criteria[1][4]. One document may be referenced as evidence in another, but none should be treated as interchangeable without the AHJ’s confirmation. Ask exactly what the reviewer is requesting.

What should Bishop's Metal Roofing provide for my project?

Bishop's Metal Roofing is identified in the business manifest as a residential metal-only specialist serving incorporated communities in Missouri and Illinois. For a project, ask for the exact manufacturer and profile, current installation instructions, product data, applicable evaluation or test documents, permit responsibilities, and written warranty terms. Bishop's states a 50-year warranty, but the current written warranty controls. The AHJ—not the contractor alone—determines which compliance documents are accepted.

References

Sources

  1. Evaluation Reports Program — ICC Evaluation Service
  2. What’s in an ICC-ES Evaluation Report — ICC Evaluation Service
  3. 2018 International Residential Code, Chapter 9: Roof Assemblies — International Code Council
  4. Codes and Standards — National Roofing Contractors Association
  5. Reports Directory — ICC Evaluation Service
  6. ICC-ES Evaluation Reports — Metal Sales Manufacturing Corporation

Built to last. Backed by Bishop's.

Make your next roof your last.

Two metal systems, one installation standard. In a consultation we inspect the roof, explain which system fits the house, and put the scope, warranty and financing options in writing.

Schedule consultation Call now