Insurance, Permits & Documents
What to Look for in Metal Roof Flashing Detail Documentation Before Work Starts
Before metal roofing begins, review the flashing drawings, product instructions, material notes, and roof transitions that determine how water moves around edges, walls, valleys, and penetrations.
Request a roof-specific flashing package that names the exact metal roof system, shows eaves, rakes, valleys, wall abutments, chimneys, skylights, pipe penetrations, gutters, slope changes, and explains how each layer laps and drains, coordinated with manufacturer instructions and Illinois provisions.
Key takeaways
- A useful submittal shows how every roof transition drains, not merely what the panel looks like[1][2].
- The exact profile, seam, slope, underlayment, fasteners, and flashing metals should be named and coordinated with manufacturer instructions[1][3].
- Illinois documentation should address intersections, gutters, valleys, openings, penetrations, and corrosion resistance; local permit review may add requirements[1].
- Ask Bishop's Metal Roofing to explain unresolved conditions in writing before materials are ordered or installation begins.
What should a roof-specific flashing drawing set include?
A flashing detail explains how the roof covering, underlayment, trim, wall, and fasteners meet. The key question is whether it matches your roof’s geometry and product. NRCA describes parallel construction details for different metal panel types and emphasizes that details at eaves, rakes, gutters, valleys, and penetrations are critical to system performance[2].
Request a marked roof plan plus enlarged details. The plan should locate ridges, valleys, eaves, rakes, walls, chimneys, skylights, vents, pipes, gutters, and unusual slope changes. Each callout should lead to a drawing with dimensions, material labels, laps, attachment points, sealant notes, and a clear water path. A generic image with no project location or system name is a starting reference, not a complete submittal.
| Document | Review question | Warning sign |
|---|---|---|
| Roof plan | Are every edge, valley, wall, opening, and penetration located?[2] | Only a generic elevation or product photo |
| Flashing details | Do sections show laps, support, dimensions, and drainage direction?[3][4] | ‘Seal all joints’ with no formed transition |
| Manufacturer instructions | Does the named profile and accessory match the installation method?[1][2] | Different profile or missing revision/date |
| Material schedule | Are metal, thickness, coating, fasteners, sealants, and membranes identified?[1][4] | ‘Contractor standard’ or ‘as needed’ |
| Open-item log | Who resolves substrate, measurement, and field-condition conflicts? | Verbal promises with no written owner |
How do I confirm the selected metal roof system in the submittal?
Standing-seam panels and metal shingles use different edge, valley, and penetration details. NRCA distinguishes architectural metal panel systems from structural assemblies and notes that seam type, panel layout, attachment, slope, and movement affect design decisions[2]. The Illinois code also gives system-specific requirements, including a minimum slope provision for standing-seam metal roof panel systems and separate provisions for metal roof shingles[1].
The package should name the manufacturer, profile, seam or shingle style, substrate, minimum slope, orientation, and accessories. It should state whether the detail is for a solid deck, spaced supports, an existing roof-over assembly, or a new deck. If a drawing substitutes another profile or accessory, request a corrected detail.
What drainage path details must each transition show?
Flashing exists where a drainage plane ends or is interrupted, including roof edges, openings, intersections, and penetrations. Building Science Corporation explains that the fundamental direction is down and out, and warns that flashing should not concentrate water onto another building element[3]. In practical terms, a detail should show where water goes after it reaches a wall, valley, curb, pipe boot, chimney, or gutter—not just where sealant is applied.
Look for positive slope on horizontal ledges, an upturned or otherwise protected back leg where needed, shingle-style laps, end dams or diverters at vulnerable locations, and an outlet that remains open. At a wall, ask how the roof flashing connects to the wall’s drainage plane and how counterflashing or cladding covers the upper edge. At a penetration, ask how the flange, boot, underlayment, and panel work together. The drawing should make the drainage sequence understandable without guesswork.
What should eave, rake, valley, and gutter details include?
Edges are structural and drainage details, not decorative finishing pieces. NRCA notes that eave and rake edge metal can provide attachment and uplift resistance, while gutters and valleys control water removal[2]. A review set should show the eave starter or cleat, drip or edge metal, panel or shingle termination, underlayment relationship, fascia, and gutter connection. The rake detail should explain how wind-facing edges are secured without creating a path behind the trim.
Valley details deserve especially close attention in Illinois because they collect concentrated runoff and may face winter ice conditions. Illinois code specifies corrosion-resistant valley flashing for metal roof shingles, minimum extension from the valley centerline, a splash-diverter rib, and lap requirements; it also addresses additional underlayment where ice backup is possible[1]. Confirm that the proposed drawing identifies the valley material, width, rib or diverter, laps, underlayment, and how adjacent panels terminate.
What must chimney, skylight, vent, and pipe penetration drawings show?
A chimney, skylight, vent, or pipe interrupts the roof plane, so the detail should show the complete assembly in section. Illinois code requires flashing at roof openings and penetrations and calls for a cricket or saddle on the ridge side of a chimney or penetration wider than 30 inches measured perpendicular to the slope[1]. The drawing should identify base flashing, counterflashing, side or step pieces, head flashing, diverters, and the direction of laps.
For pipe penetrations, ask whether the boot is approved for the chosen profile and whether its flange is integrated with the underlayment and panel sequence. For a chimney or wall, ask which layer sheds water first and which layer covers the upper edge. ‘Seal all joints’ is not a substitute for a formed, lapped, supported transition. Sealants can be part of a detail, but the drawing should not rely on an unidentified bead as the primary drainage strategy[3].
What material, fastener, and movement information is required?
Specifications should identify flashing metal, thickness or standard, coating, finish, compatible fasteners, clips, sealants, membranes, and accessories. Illinois code requires corrosion-resistant metal flashing of at least 0.019 inch where metal flashing is used in the general roof-flashing provision[1]. For metal roof coverings, the code directs installers to use manufacturer-recommended fasteners and gives fallback material rules when recommendations are absent[1]. Reject vague notes such as ‘use appropriate screws.’
Standing-seam details also need room for thermal movement. NRCA explains that fixed points, panel expansion and contraction, panel length, material type, and temperature change affect how details are designed[2]. Ask the reviewer to identify fixed and sliding attachment points, clip or fastener locations, expansion joints where relevant, and movement-compatible flashings. Also ask about dissimilar metals and treated wood or other adjacent materials; the written detail should address separation or compatibility instead of leaving corrosion risk to field judgment.
How should the flashing submittal be used for pre-work coordination?
A strong submittal connects four documents: the proposal or scope, the roof plan, the manufacturer’s current installation instructions, and the project-specific flashing details. University of Houston’s sheet-metal specification identifies forming, joining, supporting, and securing details as submittal subjects[4].
Write down every open question and the response. Confirm who supplies custom trim, who measures unusual conditions, whether the deck or wall substrate is an assumption, what happens if concealed damage changes the detail, and how revisions are approved.
What should I ask Bishop's Metal Roofing to provide before work starts?
Ask Bishop's to identify which documented system applies to your home and to show the corresponding flashing package before work starts.
A useful conversation can be simple: ‘Show me the detail for this wall, this valley, this chimney, and this pipe. Which manufacturer instruction governs it? What material and fastener are called out? Where does water exit?
This homeowner guide is educational and does not replace the current adopted code, permit-review requirements, manufacturer instructions, a contract, or a qualified professional’s project-specific judgment. Do not access a roof or diagnose concealed conditions based on this article. Bishop's Metal Roofing facts are limited to the supplied business-fact manifest; current written proposals, warranty terms, financing offers, and project documents control.