What Should I Do if a Roof Inspector Issues a Correction Notice?

Quick answer

Treat the written correction notice as controlling: keep the permit, notice, approved plans, and reinspection instructions; have the responsible contractor or qualified professional map each item to the adopted local code and exact metal-system instructions, correct the items, preserve dated evidence, then request reinspection.

What specific steps should I take after receiving a correction notice?

Exact wording
Separate an observed condition from the required remedy. Quote the notice, ask the issuing office what controls, and do not replace a specific correction with a generic roof check[1][4].
Local code and amendments
The model IRC is a starting point; the AHJ’s adopted edition, amendments, approved plans, and written variances control. Confirm them locally[2][4].
System instructions
Compare the correction with current instructions for the exact profile, underlayment, fasteners, flashing, slope, and accessories. Metal panels must follow manufacturer instructions[2][3].
Visibility and evidence
Do not conceal an approval-required item prematurely. Keep dated photos, product data, invoices, and scope changes; records do not replace a required field inspection[1][3].
Readiness and responsibility
Follow the department’s request route and make the site ready. The installer explains its work; the AHJ decides acceptance[1][4].
From correction notice to reinspection
StageWhat to confirmEvidence to keepWho acts
Notice receivedEvery cited item, permit number, deadline, and contact routeOriginal notice and inspection recordOwner and contractor[1][4]
Scope resolvedCode edition/amendment, approved plans, and specified system instructionsMarked scope, product documents, and change records[2][3]Contractor; AHJ clarifies code questions[2][4]
Correction visibleNo cited work is concealed before approval where the AHJ requires visibilityDated photos and invoices; keep access coordinated[1]Contractor and owner[1]
Reinspection requestedRequest method, notice period, readiness, and any feeRequest confirmation and updated inspection record[1][4]Permit applicant or authorized agent[1][4]

When metal makes sense

  • The correction can be matched to current, product-specific installation instructions and approved details[2][3].
  • The owner and installer can preserve the cited work and assemble a clear permit record before review[1].
  • The AHJ confirms the correction path, including any requested evaluation report or tested-assembly documentation[2][5].

When it is not recommended

  • Do not treat the project as complete while a correction remains open or the AHJ has not accepted the response[1][4].
  • Do not select a different product to avoid a cited detail or substitute a generic internet detail for system instructions[2][3].
  • Pause for written clarification when the notice, plans, product documents, or responsible parties conflict[2][4].
  • Metal is not an immediate answer to concealed structural, moisture, or life-safety conditions requiring site evaluation; this page cannot diagnose them remotely.

This educational page does not replace the issuing authority’s written correction notice, adopted code, permit file, inspection record, manufacturer instructions, or advice from an appropriately qualified local professional. It cannot diagnose an unseen roof, direct unsafe access, interpret legal or insurance rights, or guarantee reinspection approval.

FAQ

Common questions about this topic

Does a correction notice mean the roof failed permanently?

No. It means the inspector recorded an item requiring correction or clarification. Resolve each item and request the prescribed reinspection; do not conceal work or assume one response guarantees approval[1][4].

Who should contact the building department?

Follow the notice and permit’s applicant or authorized-agent procedure. Some jurisdictions use the contractor; others allow the owner or permit holder. Cass County uses the same method as other inspections, but timing and fees differ locally[1].

What evidence should I send with a reinspection request?

Keep the notice, permit, approved plans, response scope, dated photos, product identification, relevant instructions, and any requested report. Submit what the AHJ asks for; records do not replace an in-person inspection[1][2][3][5].

Can paperwork alone clear a roofing correction?

A documentation gap may be resolved with records, but workmanship usually requires inspection. The department controls; do not call invoices or photos approval unless the authority records that result[1][4].

Should I request reinspection after fixing only some items?

Usually no when the notice requires all listed items first. Cass County expressly requires every item; West Dundee describes further reinspection for partial compliance. Confirm readiness and any local fee[1][4].

Does an evaluation report automatically solve the correction?

No. It matters only when the AHJ requests or accepts it for the cited system and conditions. It must match the product and assembly; the official decides whether field correction remains necessary[2][5].

References

Sources

  1. Inspection Request Procedure with Closed Dates — Cass County, Missouri
  2. Chapter 1 Building Codes — Village of West Dundee, Illinois
  3. 2021 International Residential Code, Chapter 9: Roof Assemblies — International Code Council
  4. Building Code, Industry, and Approval Standards — Insurance Institute for Business & Home Safety
  5. Selection & Installation of Metal Panel Roof Coverings — FORTIFIED Home / Insurance Institute for Business & Home Safety

Built to last. Backed by Bishop's.

Make your next roof your last.

Two metal systems, one installation standard. In a consultation we inspect the roof, explain which system fits the house, and put the scope, warranty and financing options in writing.

Schedule consultation Call now